Airport Baggage Automation

Title            : Airport Baggage Handling System
Segment : Airport – Material Handling

REQUIREMENTS
  • Design Assistance in ePLAN(deputation).
  • Pre-commissioning.
  • Commissioning.
  • After Commissioning Service and Support.
IMPLEMENTATION
  • First power up and IO testing.
  • Performing Pre-commissioning and Commissioning tests.
  • Functional tests of the operating components.
  • Operation tests of whole system in Manual and then in Auto mode.
  • Performance tests include performing IOs, functional and operational tests in presence of the end user/owner of the system.
BENEFITS
  • Handling Huge volume at very high speed.
  • Accurate data & tracking of baggage on the entire conveyor.