Background

Upgradation of an existing terminal to manage higher volume of baggage and at the same time reduce the turnaround time for collection of passenger luggage.

Implementation

  • Provided design assistance in EPLAN
  • Performed pre-commissioning and commissioning tests
  • First power up and IO testing
  • Functional tests of the operating components
  • Operation tests of whole system in manual and then in auto mode.
  • Performance tests include performing IOs, functional and operational tests in presence of the end user/owner of the system
  • Provided after commissioning service and support

Outcome

  • Developed capability to handle a large volume of baggage at high speeds
  • Accurate data & tracking of baggage on the entire conveyor for monitoring and transparency
Airport Baggage Automation