Background
Upgradation of an existing terminal to manage higher volume of baggage and at the same time reduce the turnaround time for collection of passenger luggage.
Implementation
- Provided design assistance in EPLAN
- Performed pre-commissioning and commissioning tests
- First power up and IO testing
- Functional tests of the operating components
- Operation tests of whole system in manual and then in auto mode.
- Performance tests include performing IOs, functional and operational tests in presence of the end user/owner of the system
- Provided after commissioning service and support
Outcome
- Developed capability to handle a large volume of baggage at high speeds
- Accurate data & tracking of baggage on the entire conveyor for monitoring and transparency