Background

The customer was using AS230 (US802) and S5 150U (US803) system and required upgradation to a new modern PCS7 system. The I/O had to be replaced with ET200 M modules.

Implementation

  • PCS7 system implementation using S7-400 redundant system
  • Remote controlling done by S7300
  • Upgraded system from Doc based to PCS7 SCADA

Outcome

  • Increased uptime led to better productivity
  • Power savings
  • Convertibility
  • Better health and environment safety
Winder Line Automation